KNITTING FACTORY

orme-2-470

The controlled yarn that is brought to the fully equipped yarn laboratory is turned into raw fabric according to the customer’s request. Besides the existing patterning possibilities of the machines, we also were able to use different types of yarn, numbers and colors to present the customer.

 

On the nearly 5 thousand square meters big production area and 144 employees, the factory is realizing a production with 129 circular knitting machines 24 hours a day and has a capacity of 25 ton/day. The desired quality during the production is monitored with 4 4 outdoor and 2 tube top quality control machines.

The fabrics, which are knitted in the knitting factory, first undergo quality control, then are identified by a identified by barcode, kept in the warehouse for a short time and finally transferred to the dyeing plant.

 

In order to fulfill the customers’ requests to 100%, the environmental conditions to knit the fabric are kept under control. The conditions are controlled centrally so that they meet 20 ºC and 65% humidity.
kumas_orgu-470-350
Yarn Factory

Yarn Factory

Paint/Finishing Factory

Paint/Finishing Factory